Hotbath
Hotbath Guy GY095 spout for concealed basin mixer tap
Lieber abholen? Wählen Sie Ihre Versandart an der Kasse
Vor 12:00 Uhr bestellt, am nächsten Werktag abholbereitNächster Werktag abholbereitRoute anzeigen
Description
Gewählte Ausführung: Colour: Brushed nickel · Length: 20 cm · Art.-Nr. GY095-20GN
The Hotbath Guy GY095 is a spout for a concealed basin mixer tap.
Benefits
- Made from solid brass, durable and sturdy
- Available in 4 finishes, so you can match it to the rest of your bathroom
- Genuine Hotbath part
- 5 year guarantee
Application
As a component or replacement part for a Hotbath tap. Combine with other products from the Hotbath Guy range in the same finish.
What's included
- Spout
Installation and connection
Easy to install.
Versions
Length: 20 cm, 25 cm
Specifications
| Brand | Hotbath |
| Article number | GY095-20GN |
| EAN | 8721264691347 |
| Colour | Brushed nickel |
| Length | 20 cm |
| Brand | Hotbath |
| Series | Guy |
| Type | Spout |
| Material | Brass |
| Warranty | 5 years |
Returns & Cancellation
At SanitairLuxe, we think it is important that you are satisfied with your purchase. In this returns and cancellation policy we explain how returns, cancellations and refunds work. Do you have questions or are you experiencing a problem? You can always contact our customer service.
Professional Installation in 4 Simple Steps
From preparation to final installation, our installation approach guarantees a clean, safe and durable installation for all types of sanitary products. Carried out efficiently and with attention to detail.
Take precise measurements of the available space and check connections, walls and floors. Correct preparation ensures a clean and safe installation of every sanitary element.
Install the required profiles, fixings and connection materials in accordance with the product specifications. Make sure all parts sit level and secure, for a durable installation.
Place the sanitary product carefully in the correct position and connect all technical components correctly. During installation, check alignment, function and a clean finish.
Complete the installation professionally with suitable seals, and check all connections for leaks and stability. Clean the surface and carry out a final inspection before handover.
















